Eurotrack

Closures

Schneider Electric to close Chasseneuil-du-Poitou plant, 145 jobs

Location
Chasseneuil-du-Poitou (Vienne); zugleich Beaumont-le-Roger, Le Vaudreuil, Pacy-sur-Eure (Eure) · 🇫🇷 France
Company
Schneider Electric
Sector
Energy
Status
announced
Affected staff
145

Schneider Electric announced on 9 September 2026 the closure of its Chasseneuil-du-Poitou plant (Vienne, 145 employees) for March 2028. At the same time, the Beaumont-le-Roger site (Eure) is to close in 2030 and be merged, together with the Le Vaudreuil and Pacy-sur-Eure plants (about 800 jobs combined), into a new site in Évreux (see linked expansions entry); relocation offers are planned for affected staff (titrespresse.com, 9 Sept 2026).

Source: ici.fr ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇫🇷 France

Open in the tracker →