Eurotrack

Infrastructure

Modal Group and Port of Dunkirk open combined transport terminal

· Rail freight / terminal

Location
Loon-Plage, Hauts-de-France · 🇫🇷 France
Project
Rail-road combined transport terminal at Loon-Plage (Port of Dunkirk)
Investment
€25m
Status
In operation (inaugurated 15 October 2026, first train 3 September 2026)

Modal Group and Dunkerque-Port inaugurated the 9.6 ha terminal beside the Loon-Plage rail yard on 15 October 2026, having invested €25m between them; it is open to all operators. Since the first train on 3 September 2026 there have been three weekly round trips to Lyon, with Italy to follow in 2027; in the long run up to 50,000 loading units a year could shift from road to rail. The project was awarded in February 2025 and the foundation stone was laid on 25 November 2025 (La Gazette France, 16 October 2026; LOK Report).

Source: lagazettefrance.fr ↗ · Archived copy ↗

Further sources: lok-report.de ↗ (Archived copy ↗)

Evidence: 2 independent sources · How well sourced is Eurotrack?

✉ Report an error

More from: 🇫🇷 France

Open in the tracker →