Bordeaux–Toulouse high-speed line under construction, opening 2032
- Location
- Nouvelle-Aquitaine and Occitanie: from Saint-Médard-d'Eyrans (Gironde, south of Bordeaux) to Saint-Jory (Haute-Garonne, north of Toulouse), via Agen and Montauban · 🇫🇷 France
- Project
- LGV Bordeaux–Toulouse (high-speed rail line)
- Investment
- EUR 10.3 billion overall financing plan (as of March 2022), including EUR 6.347 billion for the new line and EUR 1.476 billion for upgrade works
- Status
- Under construction
The 222 km new high-speed line (plus a 6.8 km connecting section at Agen) for TGV and freight traffic will link Saint-Médard-d'Eyrans south of Bordeaux with Saint-Jory north of Toulouse via Agen and Montauban, designed for speeds up to 320 km/h. Construction started on 7 May 2024; it is carried by SNCF Réseau and financed by the French state (40%), local authorities (40%) and the EU (20%). Opening is planned for 2032.
Source: de.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · second source missing (two-source rule) · How well sourced is Eurotrack?
More from: 🇫🇷 France