Calvados wind farm off Normandy delays commissioning to 2027
- Location
- English Channel off Courseulles-sur-Mer (Calvados department, Normandy), France · 🇫🇷 France
- Project
- Calvados Offshore Wind Farm
- Investment
- approx. EUR 2 billion
- Status
- Under construction
The wind farm off Courseulles-sur-Mer in the English Channel will have 448 MW installed capacity from 64 Siemens Gamesa turbines (7 MW each). It is operated by the Eolien Maritime France partnership of EDF Renewables, Enbridge and wpd; commissioning has been delayed to late 2027 due to monopile installation issues.
Source: en.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · second source missing (two-source rule) · How well sourced is Eurotrack?
More from: 🇫🇷 France