Eurotrack

Infrastructure

Île-de-France opens first cable car line C1 in Val-de-Marne

· Transport / public transport

Location
Val-de-Marne (Créteil, Valenton, Limeil-Brévannes, Villeneuve-Saint-Georges) · 🇫🇷 France
Project
Cable car line C1 Créteil–Villeneuve-Saint-Georges (Île-de-France Mobilités)
Investment
not specified
Status
Opened on 13 December 2025

The C1 cable car is the first of its kind in the Île-de-France; it links Créteil, Valenton, Limeil-Brévannes and Villeneuve-Saint-Georges and was inaugurated on 13 December 2025. Over 4.5 km and five stations, 105 cabins with ten seats each operate; the journey takes about 18 minutes, against at least 35 by bus, and 11,000 passengers a day are expected. It was built in three years by a consortium led by Doppelmayr France; the infrastructure is funded 49% by the region, 30% by the Val-de-Marne département and 21% by the state and EU, while Île-de-France Mobilités pays for the cabins and operation and Transdev is the operator. (LOK Report, 15 Dec 2025)

Source: lok-report.de ↗ · Archived copy ↗

Further sources: presse.iledefrance-mobilites.fr ↗ (Archived copy ↗)

Evidence: 2 independent sources · How well sourced is Eurotrack?

✉ Report an error

More from: 🇫🇷 France

Open in the tracker →