Bull doubles capacity with new production building in Angers
- Location
- Angers · 🇫🇷 France
- Company
- Bull
- Sector
- Industry
- Investment
- €80m
Bull, the computer maker split off from Atos and controlled by the French state since April 2026, opened a new production building in Angers on 2 October 2026 with about 10,700 m² of manufacturing space, where supercomputers, AI systems and servers are assembled and tested. Capacity doubles from six to twelve racks a month, with 24 possible in 2027 if demand requires; rebuilding the whole site costs €80m and is due to be finished in 2028. The company gave no figure for new jobs (Bull press release via 24matins, 2 Oct 2026; second source: Sud Radio/AFP, 2 Oct 2026).
Source: 24matins.fr ↗ · Archived copy ↗
Further sources: sudradio.fr ↗ (Archived copy ↗)
Evidence: 2 independent sources · archived copy saved · How well sourced is Eurotrack?
More from: 🇫🇷 France