RWE and Masdar win consent for Dogger Bank South West wind farm
- Location
- North Sea, approx. 100 km off the northeast coast of England (Dogger Bank area) · 🇬🇧 United Kingdom
- Project
- Dogger Bank South West Offshore Wind Farm
- Investment
- not specified (no site-specific figure in the checked sources; RWE/Masdar referenced an overall £11bn investment for Dogger Bank projects generally at COP28 in 2023, not broken down to South West)
- Status
- Approved/planned
Dogger Bank South West is one of two 1,500 MW sub-projects (together with Dogger Bank South East, 3 GW combined) in the Dogger Bank area of the North Sea, about 100 km off the northeast coast of England. It is operated by a joint venture of RWE (51%) and Masdar (49%); the project won a Contract for Difference in January 2026 (Allocation Round 7) and received development consent (Development Consent Order) in May 2026. Final investment decision (FID) is targeted for 2027, with first delivery phase targeted for 2030/2031; a site-specific investment figure and exact turbine count were not disclosed in the sources checked (RWE, Masdar).
Source: en.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?
More from: 🇬🇧 United Kingdom