Adif builds new rail link from Chamartín to Madrid airport's T4
- Location
- Madrid, route from Chamartín Clara Campoamor station to Terminal 4 of Adolfo Suárez Madrid-Barajas Airport · 🇪🇸 Spain
- Project
- New high-speed rail link Chamartín–Madrid-Barajas Airport T4
- Investment
- approx. EUR 63 million (funded through the EU's NextGenerationEU recovery programme)
- Status
- Under construction
Spanish infrastructure manager Adif is building a 3.5 km standard-gauge (UIC) rail link between Madrid-Chamartín Clara Campoamor station and the access tunnel to Terminal 4 of Adolfo Suárez Madrid-Barajas Airport, enabling high-speed trains to reach the airport directly for the first time. Part of the route reuses the existing 8.8 km commuter line opened in 2011 (partly triple-tracked). The investment is about EUR 63 million, funded through the EU's NextGenerationEU recovery programme, with opening planned for 2026.
Source: railwaypro.com ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?
More from: 🇪🇸 Spain