Eurotrack

Infrastructure

West Midlands Metro opens Birmingham Eastside extension

· Transport / rail

Location
Birmingham, West Midlands · 🇬🇧 United Kingdom
Project
West Midlands Metro – Birmingham Eastside extension (to Millennium Point)
Investment
around £245m for this construction phase (incl. approx. £18m for the battery-powered interim section); the full project through to Digbeth is budgeted at over £350m
Status
Completed / in operation (partial section, temporary battery-powered terminus)

The roughly 1.7 km extension of the West Midlands Metro branches off between the Bull Street and Corporation Street stops and opened on 5 April 2026 with two new stations, Albert Street and Millennium Point. Between Albert Street and Millennium Point trams run on battery power since the overhead line ends there — a temporary terminus until track can be laid to the HS2 Curzon Street station. This construction phase cost around £245m (including £18m for the interim battery section); the planned continuation to Digbeth Coach Station is part of a wider project budgeted at over £350m.

Source: en.wikipedia.org ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇬🇧 United Kingdom

Open in the tracker →