Eurotrack

Infrastructure

Spain completes Madrid–Murcia high-speed line

· Transport / rail

Location
Region of Murcia (Beniel–Murcia section) · 🇪🇸 Spain
Project
Beniel–Murcia del Carmen high-speed rail section (Madrid–Murcia AVE)
Investment
more than €410 million (Beniel–Murcia section)
Status
Completed / in operation (since 20 Dec 2022)

The roughly 16 km Beniel–Murcia del Carmen section completes the Madrid–Murcia high-speed line (part of the Mediterranean Corridor, co-financed with EU ERDF/FEDER funds) and was formally inaugurated on 19 December 2022 by King Felipe VI and Prime Minister Pedro Sánchez, with regular passenger service beginning on 20 December 2022. More than €410 million were invested, including advanced signalling technology; travel time between Madrid and Murcia dropped to 2 hours 45 minutes with eight daily AVE connections.

Source: lamoncloa.gob.es ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇪🇸 Spain

Open in the tracker →