Beatrice wind farm off Scotland is now complete
- Location
- North Sea, Moray Firth off the northeast coast of Scotland · 🇬🇧 United Kingdom
- Project
- Beatrice Offshore Wind Farm
- Investment
- approx. GBP 2.6 billion
- Status
- Operational
Beatrice Wind Farm is located in the Moray Firth in the North Sea, about 13 km off Scotland's northeast coast, and consists of 84 Siemens Gamesa SWT-7.0-154 turbines rated at 7 MW each, for a total installed capacity of 588 MW. It is operated by a consortium of SSE Renewables, Red Rock Power, Equitix and The Renewables Infrastructure Group, with reported investment of around GBP 2.6 billion. Power generation began in July 2018, with full completion in May 2019; the wind farm has been operational since then.
Source: en.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · second source missing (two-source rule) · How well sourced is Eurotrack?
More from: 🇬🇧 United Kingdom