Eurotrack

Infrastructure

Moravian Corridor: Adrani–Preljina section near Čačak opens

· Transport / road

Location
Central Serbia (Čačak–Kraljevo) · 🇷🇸 Serbia
Project
E-761 motorway (Moravian Corridor), Adrani–Preljina (28.71 km)
Investment
not disclosed
Status
Opened on 27 Jun 2026; the last stretch Adrani–Vrba (about 12 km) is still missing

This makes 100.34 km of the corridor usable, rising to 112.37 km after the last section. President Vučić had announced its completion for September 2026; no confirmation has been found (Putevi Srbije, 28 Jun 2026).

Source: putevi-srbije.rs ↗ · Archived copy ↗

Evidence: one source · How well sourced is Eurotrack?

✉ Report an error

More from: 🇷🇸 Serbia

Open in the tracker →