Moravian Corridor: Adrani–Preljina section near Čačak opens
- Location
- Central Serbia (Čačak–Kraljevo) · 🇷🇸 Serbia
- Project
- E-761 motorway (Moravian Corridor), Adrani–Preljina (28.71 km)
- Investment
- not disclosed
- Status
- Opened on 27 Jun 2026; the last stretch Adrani–Vrba (about 12 km) is still missing
This makes 100.34 km of the corridor usable, rising to 112.37 km after the last section. President Vučić had announced its completion for September 2026; no confirmation has been found (Putevi Srbije, 28 Jun 2026).
Source: putevi-srbije.rs ↗ · Archived copy ↗
Evidence: one source · How well sourced is Eurotrack?
More from: 🇷🇸 Serbia