Eurotrack

Infrastructure

Uster indoor pool gets renovated 50-metre pool

· Public infrastructure / building

Location
Uster, Canton of Zurich · 🇨🇭 Switzerland
Project
Uster Indoor Pool (Buchholz) – Renovation and Expansion with 50m Pool
Investment
CHF 38.2 million gross construction cost (net around CHF 30.5–30.9 million for the city of Uster after federal [CHF 4m] and cantonal [CHF 3.5m] contributions)
Status
Completed / operational

The Buchholz indoor pool in Uster was renovated and expanded with a new 50m Olympic pool with 10 lanes (replacing four 25m lanes); voters approved the CHF 38.2 million gross-cost credit on 30 March 2014. After about 1.5 years of construction (starting spring 2015), the pool reopened on the first weekend of December 2016 and, with 2,015 m² of water surface, is considered Switzerland's largest public indoor pool; it also serves as a national training center for Swiss Aquatics.

Source: uster.ch ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇨🇭 Switzerland

Open in the tracker →