Eurotrack

Under construction & planned

Abbanoa presents renewed Pischinaccia water treatment plant

· Water / drinking water supply

Location
Tempio Pausania, Alta Gallura (Sardinia) · 🇮🇹 Italy
Project
Pischinaccia drinking water plant and pipeline to the Monte di Deu dam (Alta Gallura)
Investment
€16m
Status
Works completed, acceptance tests by year-end

Water utility Abbanoa and the Sardinian water authority Egas presented the facilities renewed for €16m in Tempio Pausania on 23 Oct 2026: the enlarged Pischinaccia treatment plant and a 6.5 km pipeline to the Monte di Deu dam, meant to supply Aggius, Bortigiadas, Calangianus, Luras and Tempio Pausania with over 50,000 residents combined. Regular operation starts after acceptance tests expected by the end of 2026; 31 Dec 2026 is a placeholder for commissioning. Announced on 23 Oct 2026 (ANSA, content produced with Abbanoa, 23 Oct 2026).

Source: ansa.it ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇮🇹 Italy

Open in the tracker →