Polar to build second 40MW data centre hall for Crusoe in Tørdal
- Location
- Tørdal, Telemark · 🇳🇴 Norway
- Project
- Tørdal data centre campus, second phase DRA02 for Crusoe
- Investment
- not disclosed
- Status
- Planned (go-live at the end of 2027)
Polar and Crusoe are extending their partnership at the hydro-powered Tørdal campus with a second hall, DRA02, providing 40MW for liquid-cooled AI servers; the first hall, DRA01 with 12MW, is in operation, and DRA02 is due online at the end of 2027. The date is a placeholder: only the end of 2027 is given. Announced on 21 October 2026 (Crusoe, 21 October 2026).
Source: crusoe.ai ↗ · Archived copy ↗