Eurotrack

Infrastructure

St. Pölten freight rail bypass worth €731m enters service

· Transport / rail

Location
Lower Austria (Wagram junction – Rohr junction, bypassing St. Pölten south of the city to Loosdorf) · 🇦🇹 Austria
Project
St. Pölten Freight Rail Bypass
Investment
EUR 731 million
Status
Completed / in operation

This roughly 24.7 km double-track high-performance line connects the Wagram junction with the Rohr junction near Loosdorf, bypassing St. Pölten to the south of the city and its main station. It includes four tunnels (including the 3,485 m Pummersdorf Tunnel) and 23 bridge structures, and was ceremonially opened on 1 December 2017, with regular operation starting at the timetable change on 10 December 2017. The project cost about EUR 731 million and relieves the Westbahn line by diverting freight traffic around the St. Pölten passenger hub; it is also the first line in Austria built without optical signals, meaning only ETCS-equipped trains can operate on it.

Source: de.wikipedia.org ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇦🇹 Austria

Open in the tracker →