SBB to upgrade Dagmersellen–Emmenbrücke line to ETCS Level 2
- Location
- Olten–Lucerne railway line, Dagmersellen (Brittnau-Wikon interlocking) – Emmenbrücke section, Cantons of Aargau/Lucerne · 🇨🇭 Switzerland
- Project
- ETCS Level 2 Dagmersellen–Emmenbrücke
- Investment
- not specified
- Status
- In planning
On the SBB Olten–Lucerne main line, the section between Dagmersellen (Brittnau-Wikon interlocking) and Emmenbrücke is to be upgraded to cab signalling (ETCS Level 2) under the SBB/BAV "needs-oriented ETCS L2" concept, since the local interlockings are reaching end-of-life and shorter train headways will be required. SBB Infrastructure tendered engineering services in 2025 for the broader adjoining Brittnau–Rothenburg section (track-km 48-88), including works at 7 stations and 6 stops. The tracker's source list gives 31 Dec 2031 as the completion date; the overarching BAV/SBB rollout programme cites a horizon to 2035 for comparable needs-oriented cab-signalling upgrades.
Source: quattron.com ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?
More from: 🇨🇭 Switzerland