ÖBB to double-track Pyhrn Railway section Hinterstoder–Pießling-Vorderstoder

· Transport / rail

Location
Pyhrn Valley, Kirchdorf an der Krems district, Upper Austria · 🇦🇹 Austria
Project
Double-track expansion Hinterstoder – Pießling-Vorderstoder (Pyhrn Railway)
Investment
not specified
Status
In planning

On the Pyhrn Railway (Linz – Selzthal), the roughly 8.5 km currently single-track section between Hinterstoder station and the Pießling-Vorderstoder operating point is being upgraded to double track with a straightened alignment – according to the ÖBB project brochure and Wikipedia this is a double-track, not four-track, expansion. The project is already in the planning stage per ÖBB Infrastruktur; per Wikipedia, construction is scheduled between late 2025 and 2031 and will allow speeds of up to 160 km/h. Hinterstoder will also become a barrier-free stop with a park-and-ride facility; investment costs are not publicly specified.

Source: infrastruktur.oebb.at ↗ · Archived copy ↗

Evidence: one source · based on reports (not independently confirmed) · archived copy saved · How well sourced is Eurotrack?

✉ Report an error