Follo Line between Oslo and Ski enters service
- Location
- Follo, Oslo region (Oslo S – Ski line, Akershus) · 🇳🇴 Norway
- Project
- Follo Line (Oslo–Ski railway tunnel)
- Investment
- NOK 36.8 billion final cost (originally budgeted at approx. NOK 26 billion in 2014)
- Status
- Opened / In operation
The Follo Line is a 22 km double-track railway between Oslo S and Ski, whose centerpiece is the 19.5 km Blix Tunnel, the longest railway tunnel in Scandinavia. Passenger service began on 11 December 2022, with the official opening by King Harald V following on 12 December 2022, halving the Oslo–Ski travel time from 22 to 11 minutes. Final costs rose from an original estimate of about NOK 26 billion (2014) to NOK 36.8 billion.
Source: no.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · second source missing (two-source rule) · How well sourced is Eurotrack?
More from: 🇳🇴 Norway