SBB builds new Ritom hydropower plant in Ticino

· Energy / hydropower

Location
Quinto, Piora/Ritom area, Canton Ticino · 🇨🇭 Switzerland
Project
New Ritom Power Plant
Investment
not specified (the official project page gives no cost figure; external sources cite differing, unverified figures between CHF 250 and 350 million)
Status
Under construction (implementation phase since 2018)

Replacement build for the SBB Ritom hydropower plant near Quinto in Ticino, originally commissioned in 1917: two 60 MW turbines (one with a 16.7 Hz generator for rail power, one with a 50 Hz generator feeding the cantonal grid), a 60 MW pump, and a 100,000 m3 balancing reservoir. The project is carried out by Ritom SA (SBB 75%, Canton Ticino/AET 25%), founded following a 2010 framework agreement; construction has been underway since 2018 with commissioning planned for 2027.

Source: company.sbb.ch ↗ · Archived copy ↗