Geneva tram Line 17 extension to Annemasse opens in autumn 2026
- Location
- Geneva / Annemasse (Geneva–Haute-Savoie cross-border region, France) · 🇨🇭 Switzerland
- Project
- Geneva Tram Line 17 – Extension Annemasse–Perrier
- Investment
- approx. EUR 41 million for construction phase 2 (incl. roughly CHF 12.3 million from the Swiss Confederation, plus funding from France, the Département Haute-Savoie, the water authority, Annemasse Agglo and the city of Annemasse)
- Status
- Under construction (completion planned for autumn 2026)
The second construction phase of the cross-border Geneva tram Line 17 extends the line by 1.2 km from the current terminus Parc Montessuit through downtown Annemasse to the new Perrier-Aubrac terminus near Lycée des Glières, adding three new stops (Place Deffaugt, Barbusse, Perrier-Aubrac) and a 200-space park-and-ride. Construction began in 2023, with total phase-2 costs of roughly EUR 41 million. The commissioning, originally planned for September 2026, has been pushed to autumn 2026 due to the G7 summit in Évian-les-Bains (15-17 June 2026); sources do not give an exact revised date.
Source: annemasse-agglo.fr ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?
More from: 🇨🇭 Switzerland