Eurotrack

Under construction & planned

Hässleholm–Lund double-track project is in early planning

· Transport / rail

Location
Skåne, southern Sweden (route between Hässleholm and Lund, approx. 80 km) · 🇸🇪 Sweden
Project
Hässleholm–Lund: Two New Continuous Railway Tracks
Investment
Approx. SEK 28 billion (2021 price level) covering this project together with five other capacity measures in Skåne; no cost figure isolated for Hässleholm–Lund alone
Status
Early planning phase (localisation study underway)

Sweden's Trafikverket plans a continuous double-track expansion of the Southern Main Line between Hässleholm and Lund (Skåne region), designed for speeds up to 250 km/h to add capacity for passenger and freight traffic. Total cost for this and five other capacity projects in Skåne is estimated at roughly SEK 28 billion (2021 price level). According to the source, the localisation study is currently underway (2026-2029), followed by a permissibility review (2030-2031) and construction (2034-2047); service is expected to start between 2043 and 2048, considerably later than the originally listed 2035 date.

Source: bransch.trafikverket.se ↗ · Archived copy ↗

Evidence: one source · based on reports (not independently confirmed) · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇸🇪 Sweden

Open in the tracker →