Eurotrack

Infrastructure

Slovakia opens D1 Hubová–Ivachnová section with Čebrať tunnel

· Transport / road

Location
Ružomberok (Žilina Region) · 🇸🇰 Slovakia
Project
D1 motorway, Hubová–Ivachnová section (Ružomberok bypass) with Čebrať tunnel
Investment
just under €289m excl. VAT (contract price according to NDS, as of 2022)
Status
Open to traffic in both directions since 05.10.2026

Slovakia's motorway company NDS opened the roughly 15km D1 section between Hubová and Ivachnová, which bypasses Ružomberok, to traffic on 05.10.2026. It includes 19 bridges, three junctions and the 3.6km Čebrať tunnel; landslides and the discovery of a cave had delayed construction by years. According to NDS, the contract price stood at just under €289m excluding VAT in 2022 (NDS, 06.10.2026; TASR, 04.10.2026; SITA, 08.05.2022).

Source: ndsas.sk ↗ · Archived copy ↗

Further sources: teraz.sk ↗ (Archived copy ↗) · sita.sk ↗ (Archived copy ↗)

Evidence: 3 independent sources · based on reports (not independently confirmed) · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇸🇰 Slovakia

Open in the tracker →