Eurotrack

Under construction & planned

DB renews Berlin Stadtbahn and adds Hbf crossover until December

· Transport / rail

Location
Berlin (Charlottenburg – Zoologischer Garten – Hauptbahnhof – Ostbahnhof) · 🇩🇪 Germany
Project
Renewal of the Stadtbahn Charlottenburg–Ostbahnhof with a new crossover at Berlin Hauptbahnhof
Investment
not specified
Status
Under construction (closure 14 Jun – 12 Dec 2026)

DB InfraGO is closing the long-distance and regional tracks of the Berlin Stadtbahn between Charlottenburg and Ostbahnhof from 14 Jun to 12 Dec 2026. Berlin Hauptbahnhof gets a crossover of four new switches for more flexibility during disruptions, 14 switches are replaced at Ostbahnhof, and bridge expansion joints, fire protection and hall roofs are also worked on. Some long-distance trains use replacement stops, regional lines terminate early or are diverted, and the S-Bahn keeps running except on three summer weekends. Announced on 23 Apr 2026 (LOK Report, 12 Jun 2026).

Source: lok-report.de ↗ · Archived copy ↗

Further sources: lok-report.de (23 Apr 2026) ↗ (Archived copy ↗) · lok-report.de (18 May 2026) ↗ (Archived copy ↗) · vbb.de ↗ (Archived copy ↗)

Evidence: 2 independent sources · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →