Eurotrack

Under construction & planned

Deutsche Bahn postpones Hamburg–Lübeck line renovation to 2028

· Transport / rail

Location
Hamburg – Lübeck, Schleswig-Holstein · 🇩🇪 Germany
Project
General renovation of the Hamburg–Lübeck railway line (Line 1120, incl. ETCS)
Investment
not specified
Status
In planning (construction start postponed from 2027 to 2028)

The roughly 60 km railway line 1120 between Hamburg and Lübeck is to be equipped with ETCS train-control technology as part of Deutsche Bahn's general renovation programme, enabling continuous ETCS operation from Puttgarden to Hamburg once the Fehmarn Belt tunnel opens. A five-month full closure was originally planned for July–December 2027, but the start of construction has since been postponed to 2028, eliminating the synergy window previously planned for the S4 suburban-rail extension. No specific cost figures have been published so far.

Source: nahverkehrhamburg.de ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →