Eurotrack

Infrastructure

DB commissions ETCS system changeover at Frankfurt (Oder) border crossing

· Transport / rail

Location
Frankfurt (Oder), Brandenburg / Rzepin, Poland · 🇩🇪 Germany / Poland
Project
ETCS-based Class B transition at the Frankfurt (Oder)–Rzepin border crossing (Oder bridge)
Investment
not specified
Status
In operation since October 2025

In October 2025 DB introduced an automatic changeover of national train protection systems while trains cross the Oder bridge at Frankfurt (Oder)–Rzepin, using 16 Eurobalises. Trains no longer have to stop or restart their on-board systems. Since the timetable change, passenger services between Berlin and Warsaw save five minutes and freight trains up to 15 minutes; the work was completed within a year together with Poland's PKP PLK. The date is a placeholder: the article gives only the month, so the end of the month is used. (LOK Report, 17 Dec 2025)

Source: lok-report.de ↗ · Archived copy ↗

Evidence: one source · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany · 🇵🇱 Poland

Open in the tracker →