DB InfraGO to reactivate Homburg–Zweibrücken line by December 2028
- Location
- Homburg (Saarland) – Einöd – Zweibrücken (Rhineland-Palatinate) · 🇩🇪 Germany
- Project
- Reactivation and electrification of the Homburg (Saar)–Zweibrücken line for the Rhine-Neckar S-Bahn
- Investment
- approx. EUR 78 million (originally approx. EUR 39 million)
- Status
- Under construction (first construction section completed; commissioning planned for December 2028)
DB InfraGO is reactivating and electrifying the Homburg–Zweibrücken line so that S-Bahn line S1 from Kaiserslautern can run through to Zweibrücken every hour; announced on 18 November 2025, with construction symbolically launched on 11 October 2025 at a railway anniversary event in Zweibrücken. The project includes a new electronic interlocking at Homburg-Einöd, reopened halts at Beeden and Schwarzenacker and an interchange station at Einöd; work runs in three sections from 2026 to 2028. On 1 September 2026 DB reported the first section (about 800 m of track at Homburg station) finished within schedule and budget, although total costs have risen from about EUR 39 million to EUR 78 million. The date is a placeholder: only December 2028 is given (LOK Report, 1 Sep 2026).
Source: lok-report.de ↗ · Archived copy ↗
Further sources: bauprojekte.deutschebahn.com ↗ (Archived copy ↗) · lok-report.de (18 Nov 2025) ↗ (Archived copy ↗) · lok-report.de (12 Oct 2025) ↗ (Archived copy ↗)
Evidence: 2 independent sources · archived copy saved · How well sourced is Eurotrack?
More from: 🇩🇪 Germany