Eurotrack

Infrastructure

Warnemünde station gets Germany's first digital interlocking

· Transport / rail

Location
Warnemünde, Rostock, Mecklenburg-Western Pomerania · 🇩🇪 Germany
Project
Warnemünde Station Modernization (Digital Interlocking and Reconstruction)
Investment
approx. EUR 65 million
Status
Completed / in operation

Warnemünde station was rebuilt starting September 2018: the non-barrier-free pedestrian underpass was replaced by a level crossing in the northern part of the station, and two new 370-meter long-distance platforms (tracks 4 and 5) were built. The centerpiece was the switch to a digital interlocking (DSTW) for the Rostock-Bramow–Warnemünde section (21 switches, 66 signals) — the first DSTW in Germany also controlling long-distance rail traffic; commissioning happened in phases in September 2019 and finally in May 2020. Federal government, state, city and Deutsche Bahn invested approximately EUR 65 million in the project.

Source: de.wikipedia.org ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →