Eurotrack

Infrastructure

Deutsche Bahn commissions ETCS between Erzingen and Konstanz

· Transport / rail

Location
High Rhine/Lake Constance area, Baden-Württemberg (Erzingen–Singen–Konstanz) · 🇩🇪 Germany
Project
Erzingen (Baden)–Konstanz ETCS commissioning
Investment
not specified
Status
Commissioned (at timetable change)

On the Erzingen (Baden)–Singen (Hohentwiel) line and at the Konstanz border station, DB InfraGO commissioned the European Train Control System (ETCS Level 1 Limited Supervision) with the timetable change on 15 December 2025. In total, around 60 kilometres of cross-border operating lines between Germany and Switzerland (including the Basel node) were equipped with ETCS in addition to the existing national train control systems. The source does not state a specific investment volume; a doubling of passenger numbers is expected on the Erzingen–Singen line.

Source: deutschebahn.com ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →