Erfurt–Leipzig/Halle high-speed line (VDE 8.2) enters service
- Location
- Thuringia, Saxony-Anhalt, Saxony (Erfurt, Leipzig, Halle) · 🇩🇪 Germany
- Project
- Erfurt–Leipzig/Halle high-speed railway (VDE 8.2)
- Investment
- approx. €2.97 billion (as of mid-2014)
- Status
- Completed / In operation
The approximately 123 km high-speed line between Erfurt and Leipzig/Halle (VDE 8.2) connects the German states of Thuringia, Saxony-Anhalt and Saxony and entered scheduled passenger and freight service at the timetable change on 13 December 2015 (opening ceremony already held on 9 December 2015 with Chancellor Merkel). The line is designed for speeds up to 300 km/h and was the first German railway fully equipped with ETCS Level 2. Investment costs totaled approximately €2.967 billion as of mid-2014.
Source: en.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · second source missing (two-source rule) · How well sourced is Eurotrack?
More from: 🇩🇪 Germany