Eurotrack

Infrastructure

Berlin–Dresden line: first section runs at 200 km/h

· Transport / rail

Location
Berlin/Brandenburg – Saxony (Berlin–Elsterwerda–Dresden line) · 🇩🇪 Germany
Project
Berlin–Dresden upgraded line – ETCS installation
Investment
not specified
Status
Completed (ETCS equipment on entire line); first section in operation at 200 km/h

The roughly 125 km upgraded line between Berlin and Dresden was fully equipped with the European Train Control System (ETCS Level 2) by the end of 2020 and prepared for a maximum speed of 200 km/h. Since December 2020, the first section, Neuhof (near Zossen)–Rückersdorf (about 67 km), has been operable at 200 km/h; the first construction phase also included 15 new electronic interlockings and the renewal of 17 stations. A second construction phase is planned for 2028/2029.

Source: bauprojekte.deutschebahn.com ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →