Nordsee Ost wind farm off Heligoland with 295 MW is operational
- Location
- North Sea, approx. 57 km north of Heligoland (German sector) · 🇩🇪 Germany
- Project
- Nordsee Ost Offshore Wind Farm
- Investment
- not specified
- Status
- Operational
The Nordsee Ost offshore wind farm lies about 57 km north of Heligoland in the German sector of the North Sea (water depth up to 25 m, site area 36 km²). It comprises 48 Senvion 6.2M126 turbines (6.15 MW each) with a total installed capacity of 295.2 MW. It is operated by Innogy (majority-owned by RWE) and was developed by RWE Innogy; the farm was commissioned on 11 May 2015, following delays in TenneT's grid connection.
Source: en.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?