DB Netz to renovate and lengthen two Nahe Valley Railway tunnels
- Location
- Nahe Valley Railway between Idar-Oberstein and Kirn, Rhineland-Palatinate · 🇩🇪 Germany
- Project
- Homericher and Enzweiler Tunnel General Renovation (Nahe Valley Railway)
- Investment
- not specified
- Status
- In planning
On the Nahe Valley Railway (Bingen–Saarbrücken), DB Netz plans a general renovation of the two tunnels between Idar-Oberstein and Kirn: the Homericher Tunnel (currently 388 m) and the Enzweiler Tunnel (currently 466 m) will be lengthened (to 394 m and 476 m respectively) and their track spacing widened from 3.5 to 4 metres. The aims are a speed increase up to 160 km/h and structural provisions for later electrification of the section; the source list gives end of 2030 as the planned completion date.
Source: de.wikipedia.org ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?
More from: 🇩🇪 Germany