Eurotrack

Infrastructure

Ebensfeld–Erfurt high-speed line (VDE 8.1) enters service

· Transport / rail

Location
Upper Franconia (Bavaria) to Erfurt (Thuringia), route through the Thuringian Forest · 🇩🇪 Germany
Project
Ebensfeld–Erfurt high-speed railway (VDE 8.1)
Investment
Around EUR 10 billion in investment for the entire VDE 8 project (Nuremberg–Berlin) per Deutsche Bahn; costs for the Ebensfeld–Erfurt section alone not separately stated
Status
Completed / in operation

The 107 km new-build Ebensfeld–Erfurt line (VDE 8.1) runs through Upper Franconia and Thuringia (34 km in Bavaria, 73 km in Thuringia), crossing the Thuringian Forest via numerous tunnels (including the roughly 8.3 km Blessberg Tunnel, Germany's longest rail tunnel) and viaducts (including the 1,681 m Ilm Viaduct). Designed for 300 km/h, the line opened on 10 December 2017 at the timetable change and is part of German Unity Transport Project No. 8 (Nuremberg–Berlin), whose total investment was around EUR 10 billion according to Deutsche Bahn.

Source: en.wikipedia.org ↗ · Archived copy ↗

Evidence: one source · based on reports (not independently confirmed) · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →