Dresden–Elsterwerda connecting curve now allows 130 km/h

· Transport / rail

Location
Coswig / Radebeul, Saxony · 🇩🇪 Germany
Project
Leipzig–Dresden upgrade line: Dresden–Elsterwerda–Kötzschenbroda connecting curve (Kurve DEK)
Investment
not specified
Status
Completed (commissioned 3 May 2020)

The Dresden–Elsterwerda–Kötzschenbroda connecting curve (Kurve DEK) near Coswig/Radebeul (Saxony) was renewed from early 2018 as part of the third construction stage of the Leipzig–Dresden upgrade line (VDE 9) and reopened on 3 May 2020 at a permitted speed of 130 km/h (up from 100 km/h). Work included a new electronic interlocking at Weinböhla, renewal of the rail embankment, replacement of the Meißner Straße railway bridge, and construction of a retaining wall plus a noise barrier up to five metres high. A specific investment figure for this section is not given in the available sources.

Source: leipzig-dresden.de ↗ · Archived copy ↗

Evidence: one source · archived copy saved · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →