Rhine Valley Railway near Freiburg: sections 8.5–8.9 in planning
- Location
- Breisgau, between Teningen and Buggingen (Freiburg im Breisgau area), Baden-Württemberg, Germany · 🇩🇪 Germany
- Project
- Karlsruhe–Basel: Upgrade of the existing line near Freiburg (planning sections 8.5–8.9)
- Investment
- not specified
- Status
- In planning
Planning sections 8.5 to 8.9 cover the upgrade of the existing Rheintalbahn between Teningen and Buggingen near Freiburg im Breisgau, roughly 45 km, for speeds up to 200 km/h, including a new tunnel at the winding Batzenberg section; part of the overall ~200 km, EU co-financed Karlsruhe–Basel expansion project on the Rotterdam–Genoa corridor. The section is currently in the planning phase; construction is scheduled to start from 2032, after completion of the Freiburg freight bypass, with planned completion by end of 2038.
Source: karlsruhe-basel.de ↗ · Archived copy ↗
Evidence: one source · archived copy saved · How well sourced is Eurotrack?
More from: 🇩🇪 Germany