Gäubahn: Horb–Neckarhausen double-tracked with new interlocking

· Transport / rail

Location
Gäubahn line between Horb am Neckar and Neckarhausen, Baden-Württemberg · 🇩🇪 Germany
Project
Double-track expansion Horb–Neckarhausen with new electronic interlocking (ESTW-A Horb)
Investment
approx. EUR 19 million
Status
Completed / in operation (full commissioning at the December 2024 timetable change)

Deutsche Bahn expanded the roughly 6 km Gäubahn section between Horb am Neckar and Neckarhausen to double track and built the new ESTW-A Horb electronic interlocking; the project (client DB Netz AG, approx. EUR 19 million, construction Sept 2021–March 2024, delivered by a joint venture of Eiffage Infra-Süd and Salcef Bau GmbH) is part of the "Digital Node Stuttgart" program. Weather- and staffing-related delays meant the line initially reopened single-track on 28 March 2024, with full double-track commissioning planned for the 15 December 2024 timetable change.

Source: lok-report.de ↗ · Archived copy ↗

Evidence: one source · How well sourced is Eurotrack?

✉ Report an error

More from: 🇩🇪 Germany

Open in the tracker →