<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>Eurotrack: Styria</title>
  <subtitle>All entries located in Styria (Austria), newest first.</subtitle>
  <link href="https://eurotrack.ai/en/regions/styria/"/>
  <link rel="self" href="https://eurotrack.ai/en/regions/styria/feed.xml"/>
  <id>tag:eurotrack.ai,2026:en:en/regions/styria</id>
  <updated>2026-11-03T06:00:00Z</updated>
  <author><name>Eurotrack</name></author>
  <entry>
    <title>🏚️ Concrete mixing plant maker Kaiser in Deutschfeistritz goes bankrupt, 44 jobs hit (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/e12979a7-concrete-mixing-plant-maker-kaiser-in-deutschfeistritz-goes/"/>
    <id>tag:eurotrack.ai,2026:e12979a7:en</id>
    <updated>2026-11-03T06:00:00Z</updated>
    <summary>Bankruptcy proceedings were opened on 3 November 2026 at the Graz regional civil court against the concrete mixing plant maker in Deutschfeistritz; 44 employees are affected and liabilities are about €7.4m. According to KSV1870 no restructuring is sought and the business is to close; an investor entry had collapsed in October (5min.at, 3 November 2026). — Source: https://www.5min.at/steiermark/5202611031554/74-millionen-euro-passiva-steirisches-traditionsunternehmen-ist-pleite/</summary>
  </entry>
  <entry>
    <title>🏚️ Phoenix Personal &amp; Logistik of Leoben goes bankrupt, 93 jobs (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/2d6a12bd-phoenix-personal-und-logistik-of-leoben-goes-bankrupt-93/"/>
    <id>tag:eurotrack.ai,2026:2d6a12bd:en</id>
    <updated>2026-07-16T06:00:00Z</updated>
    <summary>Bankruptcy proceedings have been opened at the Leoben regional court against Styrian temp-staffing firm Phoenix – Personal &amp; Logistik GmbH, affecting 93 workers (7 direct employees, 83 leased workers) and around 128 creditors. Liabilities of roughly €2.6 million stand against assets of only about €625,000; whether the business will be continued or liquidated remains open according to the filing. Second source: AKV creditor protection association. — Source: https://www.meinbezirk.at/leoben/c-wirtschaft/leobener-personal-firma-pleite-dutzende-mitarbeiter-betroffen_a8802273</summary>
  </entry>
  <entry>
    <title>🏭 PJ Monitoring opens new production hall in Graz (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/4f19dc62-pj-monitoring-opens-new-production-hall-in-graz/"/>
    <id>tag:eurotrack.ai,2026:4f19dc62:en</id>
    <updated>2026-06-22T06:00:00Z</updated>
    <summary>PJ Monitoring (PJM) has put a new digital production hall into operation at its Graz production site for the WaggonTracker, its system combining automatic brake testing and condition monitoring for freight wagons; the company says capacity rises sharply, and every unit undergoes a 48-hour final test. The existing hall will in future be used for development and prototype building; because the development team has grown within 1.5 years, PJM also took additional offices in the nearby Science Tower. The report gives neither an investment amount nor a headcount (LOK Report, 22 Jun 2026). Update (22 June 2026): PJ Monitoring has put its new digital production hall in Graz into operation. (LOK Report, 22 June 2026) — Source: https://www.lok-report.de/news/deutschland/industrie/pjm-neue-digitale-produktionshalle.html</summary>
  </entry>
  <entry>
    <title>🚄 Graz opens new Neutorlinie tram route through the city centre (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/9f54d549-graz-opens-new-neutorlinie-tram-route-through-the-city/"/>
    <id>tag:eurotrack.ai,2026:9f54d549:en</id>
    <updated>2025-11-29T06:00:00Z</updated>
    <summary>On 29 November 2025, the new "Neutorlinie" of the Graz tramway network went into service, connecting Jakominiplatz with Annenstraße via Neutorgasse. The new route relieves the previous alignment through Herrengasse in Graz's city centre from through traffic. Line 17 operates on the new route during the day, while line 16 takes over in the evenings, on weekends and on public holidays. — Source: https://en.wikipedia.org/wiki/Trams_in_Graz</summary>
  </entry>
  <entry>
    <title>📉 AVL to cut a further 100 jobs in Graz (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/ef2e210b-avl-to-cut-a-further-100-jobs-in-graz/"/>
    <id>tag:eurotrack.ai,2026:ef2e210b:en</id>
    <updated>2025-11-20T06:00:00Z</updated>
    <summary>AVL is cutting a further 100 jobs in Graz (out of around 3,600 employees at the site). Hundreds of cuts had already been announced in summer 2025. The automotive supplier is suffering from a sales slump and the transformation of the industry. — Source: https://kurier.at/wirtschaft/avl-graz-stellen-abbau-kuendigungen/403104926</summary>
  </entry>
  <entry>
    <title>🤝 Boom Software and PJ Messtechnik form INFRATRACK rail-testing venture (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/bcd5157e-boom-software-and-pj-messtechnik-form-infratrack-rail/"/>
    <id>tag:eurotrack.ai,2026:bcd5157e:en</id>
    <updated>2025-11-13T06:00:00Z</updated>
    <summary>The rail specialists Boom Software AG and PJ Messtechnik GmbH founded the joint venture INFRATRACK Solutions in Graz in July 2025 and are taking over the rail siding at the former Verbund coal power plant in Mellach, shut down in 2020. The fully electrified track with a hall and crane serves as a test track for rail vehicles and components, from measurement instrumentation and commissioning through acoustic and EMC measurements to sensor- and software-based tests. The report gives no price or investment figure; the managing directors are Andreas Schaller and Martin Joch. (LOK Report, 13 Nov 2025) — Source: https://www.lok-report.de/news/europa/oesterreich/63070-oesterreich-pjm-und-boom-software-gruenden-infratrack-solutions-und-nuetzen-die-anschlussbahn-eines-stillgelegten-kohlekraftwerks.html</summary>
  </entry>
  <entry>
    <title>🚄 Wieserbahn electric services start to Wies-Eibiswald (Austria)</title>
    <link href="https://eurotrack.ai/en/developments/d0cd9e43-wieserbahn-electric-services-start-to-wies-eibiswald/"/>
    <id>tag:eurotrack.ai,2026:d0cd9e43:en</id>
    <updated>2025-08-04T06:00:00Z</updated>
    <summary>On 4 August 2025, electric train operation began on the 33-kilometre section of the Wieserbahn between Wettmannstätten and Wies-Eibiswald, coinciding with the commissioning of the Koralm Railway. This enabled Graz-Köflacher Bahn (GKB) electric trains to run through for the first time on the route Graz main station–Hengsberg–Wettmannstätten–Wies-Eibiswald. The remaining, still non-electrified section of the Wieserbahn is scheduled for completion by 2033 according to Wikipedia. — Source: https://de.wikipedia.org/wiki/Wieserbahn</summary>
  </entry>
</feed>
