<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>Eurotrack: Mecklenburg-Western Pomerania</title>
  <subtitle>All entries located in Mecklenburg-Western Pomerania (Germany), newest first.</subtitle>
  <link href="https://eurotrack.ai/en/regions/mecklenburg-western-pomerania/"/>
  <link rel="self" href="https://eurotrack.ai/en/regions/mecklenburg-western-pomerania/feed.xml"/>
  <id>tag:eurotrack.ai,2026:en:en/regions/mecklenburg-western-pomerania</id>
  <updated>2026-07-24T06:00:00Z</updated>
  <author><name>Eurotrack</name></author>
  <entry>
    <title>🤝 DERTOUR acquires remaining stake in DSR Hotel Holding (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/e72d73c0-dertour-acquires-remaining-stake-in-dsr-hotel-holding/"/>
    <id>tag:eurotrack.ai,2026:e72d73c0:en</id>
    <updated>2026-07-24T06:00:00Z</updated>
    <summary>Effective 1 August 2026 DERTOUR Group (REWE Group) is acquiring, through DERTOUR Hotel &amp; Resorts GmbH, the stake in DSR Hotel Holding previously held by Deutsche Seereederei, making it the sole owner; the holding had already been raised to 74.9% in 2024. DSR Hotel Holding operates 34 hotels in Germany, Austria and Italy (brands A-ROSA, aja, HENRI plus individual properties such as Louis C. Jacob and Hotel NEPTUN) and employs more than 2,700 people. No purchase price was disclosed. — Source: https://www.dertour-group.com/strategischer-ausbau-der-hotelaktivitaeten-dertour-group-wird-alleinige-eigentuemerin-der-dsr-hotel-holding/</summary>
  </entry>
  <entry>
    <title>🚄 Passenger trains return from Greifswald to Lubmin after 27 years (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/db414f30-passenger-trains-return-from-greifswald-to-lubmin-after-27/"/>
    <id>tag:eurotrack.ai,2026:db414f30:en</id>
    <updated>2026-07-11T06:00:00Z</updated>
    <summary>Passenger trains have run again on the roughly 25 km Greifswald–Lubmin line since the premiere trip on 11 Jul 2026, the first since 1999, operated by Pressnitztalbahn on behalf of Mecklenburg-Western Pomerania. The summer line runs only at weekends during the school holidays with RegioShuttle railcars (about 33 minutes end to end) and is meant to gather demand data for a lasting concept. It was announced on 2 Apr 2026 as part of the state's mobility offensive (LOK Report, 13 Jul 2026). — Sources: https://www.lok-report.de/news/deutschland/aus-den-laendern/mecklenburg-vorpommern-sommerlinie-verbindet-greifswald-und-lubmin-wieder-per-bahn.html · https://mvfaehrtgut.de/sommerlinie-greifswald-lubmin/ · https://www.lok-report.de/news/deutschland/aus-den-laendern/mecklenburg-vorpommern-bahn-zurueck-nach-lubmin.html</summary>
  </entry>
  <entry>
    <title>🚄 DB reopens modernised Ludwigslust–Parchim line (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/f8237898-db-reopens-modernised-ludwigslust-parchim-line/"/>
    <id>tag:eurotrack.ai,2026:f8237898:en</id>
    <updated>2026-06-18T06:00:00Z</updated>
    <summary>DB InfraGO renewed the Ludwigslust–Parchim line in two construction phases (September to December 2023 as far as Neustadt-Glewe, August 2025 to April 2026 through to Parchim) and upgraded it for up to 100 km/h. The work covers a renewed track bed, adapted level crossings and accessible stops at Gross Laasch, Dütschow and Spornitz; the second phase fell within the closure for the Hamburg–Berlin corridor renewal. DB announced the return to service on 18 Jun 2026; a further EUR 0.5 million of federal money goes into Ludwigslust station building (LOK Report, 18 Jun 2026). — Source: https://www.lok-report.de/news/deutschland/aus-den-laendern/mecklenburg-vorpommern-schneller-unterwegs-zwischen-ludwigslust-und-parchim.html</summary>
  </entry>
  <entry>
    <title>🏭 ODIG expands Parchim depot for EUR 18 million for battery trains (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/3439915d-odig-expands-parchim-depot-for-eur-18-million-for-battery/"/>
    <id>tag:eurotrack.ai,2026:3439915d:en</id>
    <updated>2026-06-17T06:00:00Z</updated>
    <summary>ODEG and its maintenance subsidiary ODIG are expanding the Parchim depot with a workshop hall, a wash hall and dedicated charging infrastructure for 14 Stadler FLIRT Akku battery trains due to enter service from December 2027 under the West Mecklenburg II contract (December 2025 to December 2040). Total cost is about EUR 18 million, with EUR 10.6 million from the state and up to EUR 1.2 million from the federal government for charging equipment; the hall is due by 2027. The number of new jobs was not given (LOK Report, 17 Jun 2026). — Source: https://www.lok-report.de/news/deutschland/aus-den-laendern/mecklenburg-vorpommern-land-foerdert-werkstattausbau-am-odeg-gruendungsstandort-parchim.html</summary>
  </entry>
  <entry>
    <title>🚄 Hamburg–Berlin railway fully reopens after renovation (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/ff4b4dc7-hamburg-berlin-railway-fully-reopens-after-renovation/"/>
    <id>tag:eurotrack.ai,2026:ff4b4dc7:en</id>
    <updated>2026-06-14T06:00:00Z</updated>
    <summary>The 278 km Hamburg–Berlin line, used by around 470 trains daily, was fully closed from 1 August 2025 for comprehensive renovation, including modernization of 28 stations, signal boxes and platform extensions. The western Hamburg–Schwerin section reopened on 15 May 2026, and the entire line has been fully operational again since 14 June 2026. The source does not state a specific investment figure. Update (2 Jul 2026): On 30 June 2026 DB InfraGO completed the acceptance runs for the continuous train control system (LZB); between Büchen and Nauen, about 170 km, long-distance trains may therefore again run at 230 km/h, and the fastest connection between the two main stations takes 1 hour 47 minutes according to the timetable. In the edge sections at the Büchen and Nauen LZB centres the speed stays at 160 km/h for now, until a further software changeover is made in the newly built electronic interlockings there; final acceptance runs on secondary tracks are still under way, which do not affect the scheduled journey time and will later allow an extra time buffer. (LOK Report, 2 Jul 2026) Update (9 Jul 2026): DB InfraGO has modernised and made step-free the three Schleswig-Holstein stations Schwarzenbek, Müssen and Büchen; Schwarzenbek was symbolically opened on 8 July 2026. Platforms have been lengthened, with eight-car trains due from the end of 2027 (about 270 more seats per RE 1 train); the lifts at Müssen are expected in October 2026, and the state is contributing around EUR 4 million. (LOK Report, 9 Jul 2026) — Sources: https://hamburg-berlin.deutschebahn.com/home.html · https://www.lok-report.de/news/deutschland/verkehr/deutsche-bahn-zugfahrten-zwischen-hamburg-und-berlin-wieder-mit-voller-geschwindigkeit-moeglich-db-infrago-schliesst-abnahmefahrten-ab.html · https://www.lok-report.de/news/deutschland/aus-den-laendern/schleswig-holstein-drei-bahnhoefe-entlang-der-strecke-hamburg-berlin-praesentieren-sich-in-neuem-gewand.html</summary>
  </entry>
  <entry>
    <title>🚄 DB opens Rostock Seehafen interlocking, timber-built Roter Riese (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/edd1eb11-db-opens-rostock-seehafen-interlocking-timber-built-roter/"/>
    <id>tag:eurotrack.ai,2026:edd1eb11:en</id>
    <updated>2026-04-21T06:00:00Z</updated>
    <summary>The new electronic interlocking in Rostock's seaport went into service on 21 Apr 2026, replacing seven older signal boxes and controlling shunting for train formation. The building contains 270 m³ of timber, is nicknamed Roter Riese and generates its own power via rooftop solar. It is one element of an overall investment of over EUR 300 million from federal and DB funds; tracks, points, overhead wires and lighting across the port are to be renewed by the end of 2032, and ground was broken in April 2023 (LOK Report, 21 Apr 2026). — Sources: https://www.lok-report.de/news/deutschland/aus-den-laendern/innovatives-estw-rostock-seehafen-roter-riese-geht-in-betrieb.html · https://bauprojekte.deutschebahn.com/p/rostock-seehafen/pdf</summary>
  </entry>
  <entry>
    <title>🤝 Greifswald university hospital to acquire Klinikum Karlsburg for €25m (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/247820cf-greifswald-university-hospital-to-acquire-klinikum/"/>
    <id>tag:eurotrack.ai,2026:247820cf:en</id>
    <updated>2025-11-13T06:00:00Z</updated>
    <summary>The Ministry of Health of Mecklenburg-Western Pomerania approves the merger of Universitätsmedizin Greifswald with Klinikum Karlsburg. The university medical centre is acquiring the hospital for around €25 million; the combination is to be completed on 1 January 2026. Update (02.04.2026): According to Klinikum Karlsburg, Greifswald University Medicine acquired the hospital from the Hamburg-based Dr. Guth group at the start of 2026; the full merger of the two hospitals is planned for 01.01.2027 (klinikum-karlsburg.de, 02.04.2026: https://www.klinikum-karlsburg.de/allgemein/diabetes-versorgung-in-karlsburg-weiter-gestaerkt/). — Source: https://www.zeit.de/news/2025-11/13/mv-gesundheitsministerium-genehmigt-klinik-fusion</summary>
  </entry>
  <entry>
    <title>🏚️ Archdiocese of Hamburg closes Groß Sand hospital in Wilhelmsburg (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/9bd5f408-archdiocese-of-hamburg-closes-gross-sand-hospital-in/"/>
    <id>tag:eurotrack.ai,2026:9bd5f408:en</id>
    <updated>2025-07-15T06:00:00Z</updated>
    <summary>The Archdiocese of Hamburg has discontinued operations; basic care provision in Wilhelmsburg has been discontinued (as of 15 July 2025). — Source: https://gesundheit-soziales-bildung.verdi.de/mein-arbeitsplatz/kirchliche-betriebe/++co++7ce40b40-ba38-11f0-8f9a-f18b7953e8e8</summary>
  </entry>
  <entry>
    <title>🚄 Warnemünde station gets Germany's first digital interlocking (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/a1c35251-warnemuende-station-gets-germany-s-first-digital/"/>
    <id>tag:eurotrack.ai,2026:a1c35251:en</id>
    <updated>2020-05-19T06:00:00Z</updated>
    <summary>Warnemünde station was rebuilt starting September 2018: the non-barrier-free pedestrian underpass was replaced by a level crossing in the northern part of the station, and two new 370-meter long-distance platforms (tracks 4 and 5) were built. The centerpiece was the switch to a digital interlocking (DSTW) for the Rostock-Bramow–Warnemünde section (21 switches, 66 signals) — the first DSTW in Germany also controlling long-distance rail traffic; commissioning happened in phases in September 2019 and finally in May 2020. Federal government, state, city and Deutsche Bahn invested approximately EUR 65 million in the project. — Source: https://de.wikipedia.org/wiki/Bahnhof_Warnem%C3%BCnde</summary>
  </entry>
  <entry>
    <title>🚄 Bad Kleinen station formally handed over after rebuild (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/0c1de193-bad-kleinen-station-formally-handed-over-after-rebuild/"/>
    <id>tag:eurotrack.ai,2026:0c1de193:en</id>
    <updated>2019-05-09T06:00:00Z</updated>
    <summary>Bad Kleinen station underwent a fundamental reconstruction starting in autumn 2016: the 137-year-old station building, engine shed and other structures were demolished in 2017 and replaced by two new island platforms reached via a pedestrian bridge with lifts. Construction was finished in December 2018, and the station has been certified barrier-free since 9 December 2018; the official handover ceremony, attended by state transport minister Christian Pegel, took place on 9 May 2019. The roughly EUR 13 million project was jointly funded by the federal government, the state, the municipality and Deutsche Bahn. — Source: https://de.wikipedia.org/wiki/Bahnhof_Bad_Kleinen</summary>
  </entry>
  <entry>
    <title>🚄 Wikinger wind farm off Rügen with 350 MW is operational (Germany)</title>
    <link href="https://eurotrack.ai/en/developments/3a2a03c7-wikinger-wind-farm-off-ruegen-with-350-mw-is-operational/"/>
    <id>tag:eurotrack.ai,2026:3a2a03c7:en</id>
    <updated>2018-12-31T06:00:00Z</updated>
    <summary>The Wikinger offshore wind farm is located in the Baltic Sea about 34 km northeast of the German island of Rügen. It has an installed capacity of 350 MW from 70 Adwen/Siemens Gamesa AD 5-135 turbines (5 MW each, 135 m rotor diameter) and is operated by the Spanish energy group Iberdrola. The investment volume was around EUR 1.4 billion; the wind farm became operational in 2018 and supplies electricity equivalent to more than 350,000 households. — Source: https://www.power-technology.com/projects/wikinger-offshore-wind-farm/</summary>
  </entry>
</feed>
