<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <title>Eurotrack: Bretagne</title>
  <subtitle>All entries located in Bretagne (France), newest first.</subtitle>
  <link href="https://eurotrack.ai/en/regions/bretagne/"/>
  <link rel="self" href="https://eurotrack.ai/en/regions/bretagne/feed.xml"/>
  <id>tag:eurotrack.ai,2026:en:en/regions/bretagne</id>
  <updated>2026-09-08T06:00:00Z</updated>
  <author><name>Eurotrack</name></author>
  <entry>
    <title>🏚️ Bolloré to close Bluebus plant in Ergué-Gabéric, 115 jobs (France)</title>
    <link href="https://eurotrack.ai/en/developments/b4f21315-bollore-to-close-bluebus-plant-in-ergue-gaberic-115-jobs/"/>
    <id>tag:eurotrack.ai,2026:b4f21315:en</id>
    <updated>2026-09-08T06:00:00Z</updated>
    <summary>The Bolloré group announced on 8 September 2026 the closure of its electric-bus subsidiary Bluebus in Ergué-Gabéric (Brittany), affecting 115 direct jobs. After about 15 years and roughly 700 buses built, the company said it never reached critical scale and the French market had been less dynamic than expected (titrespresse.com, 8 Sept 2026). — Source: https://actu.orange.fr/economie/en-bretagne-bollore-stoppe-la-production-de-ses-bus-electriques-CNT000002rOCTO.html</summary>
  </entry>
  <entry>
    <title>🤝 UK's CMA clears Danone's takeover of Huel in phase 1 (France / United Kingdom)</title>
    <link href="https://eurotrack.ai/en/developments/312a5484-uk-s-cma-clears-danone-s-takeover-of-huel-in-phase-1/"/>
    <id>tag:eurotrack.ai,2026:312a5484:en</id>
    <updated>2026-08-20T06:00:00Z</updated>
    <summary>The UK Competition and Markets Authority had been reviewing Danone Holdings (UK)'s planned acquisition of British nutrition brand Huel (meal-replacement products) since 27 May 2026, launched a formal phase 1 investigation on 15 July 2026 and cleared the deal unconditionally on 20 August 2026 (full decision published 25 August 2026). The purchase price was not disclosed. — Source: https://www.gov.uk/cma-cases/danone-slash-huel-merger-inquiry</summary>
  </entry>
  <entry>
    <title>🚄 Brest opens new tram Line B to the hospital (France)</title>
    <link href="https://eurotrack.ai/en/developments/c6e277f7-brest-opens-new-tram-line-b-to-the-hospital/"/>
    <id>tag:eurotrack.ai,2026:c6e277f7:en</id>
    <updated>2026-02-14T06:00:00Z</updated>
    <summary>Line B of the Brest tramway connects Brest railway station with the Cavale Blanche hospital (CHU) over 11 stops and 5.1 km (about 17 minutes travel time). It opened to the public on 14 February 2026 and is operated with eight Alstom Citadis 305 trams, linking to Line A at Place de la Liberté as part of the Bibus network. The roughly EUR 225 million project was jointly funded by Brest Métropole, the French state, the Brittany region, the city of Brest, the EU and the Agence de l'Eau Loire Océan. — Source: https://en.wikipedia.org/wiki/Brest_tramway</summary>
  </entry>
  <entry>
    <title>🚄 France commissions Saint-Brieuc offshore wind farm (France)</title>
    <link href="https://eurotrack.ai/en/developments/50cd4e86-france-commissions-saint-brieuc-offshore-wind-farm/"/>
    <id>tag:eurotrack.ai,2026:50cd4e86:en</id>
    <updated>2023-12-31T06:00:00Z</updated>
    <summary>The Saint-Brieuc offshore wind farm is located in the Bay of Saint-Brieuc in the English Channel, about 16 km off the coast of Brittany. With 62 Siemens Gamesa SG 8.0-167 DD turbines it reaches an installed capacity of 496 MW and is operated by Ailes Marines, a subsidiary of Iberdrola. First power was generated in July 2023, with full commissioning in May 2024; the investment volume was approximately EUR 2.4 billion. — Source: https://en.wikipedia.org/wiki/Saint-Brieuc_Offshore_Wind_Farm</summary>
  </entry>
</feed>
